STAGE 4:
This screen indicates
when the
DRAW OFF PERIOD
is
available for water to be drawn off
by the dialysis machines.
STAGE 5:
Once the
DRAW OFF
PERIOD
has completed the system
will enter its
COOL DOWN PERIOD
,
introducing cold RO water into the
system until the accept
temperature is reached.
STAGE 6:
The final part of the heat
disinfection cycle is to fully drain
down the integral tank on the unit.
DRAIN IN OPERATION
indicating
that this stage is in process. On
completion the screen will revert
back to
STANDBY
.
Data Logging
The
Heatsan
disinfection system will automatically log data every 5
minutes during operation. This will capture the information from the
SYSTEM MONITOR
screen.
It is recommended that this data be periodically transferred to a USB drive
and stored on a computer for diagnostics. The memory on the HMI can
then be cleared without fear of data loss.
DRAW OFF PERIOD
COOL DOWN PERIOD
DRAIN IN OPERATION
Summary of Contents for Heatsan 00HS208
Page 51: ...50 98 0156 Rev G Heatsan Process Flow Diagram ...
Page 52: ...51 98 0156 Rev G Wiring Diagrams ...
Page 53: ...52 98 0156 Rev G ...
Page 54: ...53 98 0156 Rev G ...
Page 55: ...54 98 0156 Rev G ...
Page 56: ...55 98 0156 Rev G ...
Page 57: ...56 98 0156 Rev G ...
Page 58: ...57 98 0156 Rev G Installation Layout Water Connection Detail ...
Page 62: ...61 98 0156 Rev G Tubing with Heatsan and MediQA Hidden ...
Page 64: ...63 98 0156 Rev G RO Divert Valve and Heatsan Divert Valve 1 Heatsan Divert Valve 2 ...
Page 65: ...64 98 0156 Rev G Heatsan Discharge Solenoid SV3A NC Heatsan Fill Solenoid SV3B NO ...
Page 70: ...69 98 0156 Rev G ...