SCPI Command Reference
A-2
M370185-01
SCPI Conformance Information
Codes and Standards
This power supply conforms to the following international standards:
•
IEEE Std. 488.2-1992, “IEEE Standard Codes, Formats, Protocols,
and Common Commands For Use With IEEE Std. 488.1-1987”
•
IEEE Std. 488.1-1987 “IEEE Standard Digital Interface for
Programmable Instrumentation”
•
TIA/EIA-232F
•
Standard Commands for Programmable Instruments (SCPI) Version
1999.0
IEEE 488.2 Requirements
GPIB control implements all IEEE 488.2 requirements.
SCPI Requirements
The power supply conforms to the following SCPI requirements:
•
SCPI mandated commands
•
Questionable Status Register (QSR), Condition, Event, Enable
•
Operation Status Register (OSR), Condition, Event, Enable
•
Status Byte Register (SBR)
•
Standard Event Status Register (SESR)
IEEE 488.2/SCPI Syntax and Style
Parameters: Units of Measure and Multipliers
Refer to IEEE 488.2, section 7.7.3 for the definition of units of measure.
The default units of measure include:
•
V (Volt – voltage)
•
A (Ampere – current)
•
W (Watt – power)
•
S (seconds – time)
These units are only supported as defaults. To place the unit in the
command will cause an error to be pushed into the error queue.
Summary of Contents for Soresen XTR 100-8.5
Page 2: ......
Page 16: ...xiv ...
Page 28: ...1 8 ...
Page 50: ...Local Operation 3 8 M370185 01 Figure 3 3 Front Panel Menu System ...
Page 93: ...Using Multiple Power Supplies M370185 01 3 51 3 ...
Page 94: ...Local Operation 3 52 M370185 01 ...
Page 128: ...Analog Programming APG and Isolated Analog Programming ISOL 4 34 M370185 01 ...
Page 198: ...Remote Operation 5 70 M370185 01 ...
Page 261: ...SCPI Command Tree M370185 01 A 35 A ...
Page 262: ...A 36 ...
Page 279: ...Index M370185 01 IX 3 described 3 7 3 36 number available 3 36 stored values 3 36 ...
Page 280: ...IX 4 ...