Fine Adjustments
Page 44 of 72
Linear Lift AL1
Raise the platform to the embarkation / disembarkation position
(see Figure 2, page 14).
Raise the transfer plate to take the weight off the cable linkage.
Loosen the locking nut on the cable linkage (see Figure 20).
Figure 20: Cable Linkage
Turn the turn-buckle on the end of the cable linkage to shorten or
lengthen the cable linkage.
Tighten the locking nut once again.
Lower the platform slightly, and then raise it to the embarkation /
disembarkation level again (see Figure 2, page 14).
Repeat the adjustment procedure if necessary.
11.3
Split Platform:
Adjusting the Platform Segments
The segments of a split platform must be adjusted such that they in-
terlock. The swivel joints must not be loaded when the platform in
the fully lowered position (the platform segments must be comple-
tely in contact with the ground).
Raise the platform to the embarkation / disembarkation position
(see Section Figure 2, page 14).
Loosen the locking nuts on the swivel joints at both sides. Hold
the hexagonal section of the bolt firmly when doing so (see Figu-
re 21).
Cable linkage
Summary of Contents for LINEARLIFT AL1
Page 1: ...Operating Instructions www amf bruns de LINEAR LIFT AL1 ...
Page 2: ......