- 11 -
H. Install overhead top beam
1. With help of the hook of top beam, put one side of top beam on top of the extension
column and connecting the top beam to extension column by bolts, tighten the bolts.
Then assemble the connecting bracket
(See Fig. 23).
Fig. 23
Hook on to the
extension columns
Tighten the bolts
23
22
21
27
1
Summary of Contents for OH-15
Page 1: ...TWO POST LIFT MODEL OH 15 Original ...
Page 4: ... 2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4 ...
Page 21: ... 19 M Install power unit See Fig 32 Fig 32 ...
Page 27: ... 25 IV EXPLODED VIEW Model OH 15 Fig 43 ...
Page 33: ... 31 4 3Manual power unit Explode View 071102 220V 60Hz Single Phase Fig 46 ...