- 16 -
L. Install cables
1.
High setting cable connection.
1.1 Take out the carriages plastic cover, cable pass through from the bottom of the
carriages and be pulled out from the open of carriages, then screw the two cable nuts
(See Fig. 29).
Fig. 29
Cable connecting
direction
Cable connecting
direction
Tighten
Summary of Contents for OH-15
Page 1: ...TWO POST LIFT MODEL OH 15 Original ...
Page 4: ... 2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4 ...
Page 21: ... 19 M Install power unit See Fig 32 Fig 32 ...
Page 27: ... 25 IV EXPLODED VIEW Model OH 15 Fig 43 ...
Page 33: ... 31 4 3Manual power unit Explode View 071102 220V 60Hz Single Phase Fig 46 ...