- 33 -
Illustration of hydraulic valve for hydraulic power unit
(See Fig. 47)
V
. TEST RUN
1. Adjust synchronous cable
(See Fig. 48)
Use Spanner to hold the cable fitting, meanwhile
use ratchet spanner to tighten the cable nut.
Make sure two cables are with the same tension
so that two carriages can work synchronously.
Fit the plastic hole cover on the lifting head.
If the carriage does not Synchronize when lifting, please tighten the cable nut.
2. Adjust safety cable
Lifting the carriages and lock at the same height, strain the safety cable and then
release a little, and then tighten the cable nuts. Make sure the safety device can always
be worked properly.
3. Exhaust air
This hydraulic system is designed to bleeding air by loosing
the bleeding plug. Lifting the carriages to about 1 meter height,
and loose the bleeding plug, the air would be bled automatically,
then tighten the plug after bleeding, the lift would work stably and smoothly,
otherwise repeat bleeding
(See Fig. 49)
.
Cable nut
Fig. 48
Bleeding plug
Fig.
47
Release valve
Handle of Release
valve
Check valve
Oil return port
Oil Outlet
Relief valve
Throttle valve
Fig. 49
Summary of Contents for OH-15
Page 1: ...TWO POST LIFT MODEL OH 15 Original ...
Page 4: ... 2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4 ...
Page 21: ... 19 M Install power unit See Fig 32 Fig 32 ...
Page 27: ... 25 IV EXPLODED VIEW Model OH 15 Fig 43 ...
Page 33: ... 31 4 3Manual power unit Explode View 071102 220V 60Hz Single Phase Fig 46 ...