- 5 -
III
.
INSTALLATION STEPS
A. Location of installation
Check and ensure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B.
Use a carpenter’s chalk line to establish installation layout of baseplate
(See Fig. 6)
C. Check the parts before assembly.
1. Packaged lift, hydraulic power unit and parts box;
(Remark: Outer column is not
packed into the machine)
(
See Fig. 7).
2. Move the lift aside with a fork lift or hoist, and open the outer packing carefully
(See Fig. 8).
Shipment Parts list
Fig. 7
Fig. 8
Top beam assy.
Aluminum Name Plate
Fig. 6
Parts box
Chalk a line
outer column
150 3/4”
Summary of Contents for OH-15
Page 1: ...TWO POST LIFT MODEL OH 15 Original ...
Page 4: ... 2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4 ...
Page 21: ... 19 M Install power unit See Fig 32 Fig 32 ...
Page 27: ... 25 IV EXPLODED VIEW Model OH 15 Fig 43 ...
Page 33: ... 31 4 3Manual power unit Explode View 071102 220V 60Hz Single Phase Fig 46 ...