4
2. Open the outer packing carefully
(See Fig. 5)
.
Shipment Parts List
3. Take off the drive-thru ramps and columns
(See Fig. 6)
.
4. Loose the screws of the upper package stand, take off the offside platform, take out
the parts inside the powerside platform, than remove the package stand.
5. Move aside the parts and check the parts according to the shipment parts list
(See Fig. 7).
Powerside Platform
Drive-in Ramp
Offside Platform
Cross Beam
Column
Fig. 5
Fig. 6
Parts box
Fig. 7
43
Summary of Contents for PRO-14
Page 1: ...FOUR POST LIFT PRO 14...
Page 2: ......
Page 4: ......
Page 11: ...7 D Install cross beams See Fig 11 Fig 12 Fig 11 Hole towards inside 1 3 2 3 Fig 12...
Page 25: ...21 O Install spring and safety cover of cross beam See Fig 34 Fig 34 3 3 3 8 40 3 2 Fig 33...
Page 27: ...23 IV EXPLODED VIEW Model PRO 14 Fig 36...
Page 28: ...24 3 73 74 CROSS BEAM CYLINDERS Fig 37 Fig 38...
Page 29: ...25 MANUAL POWER UNIT Fig 39 220V 50HZ 1 phase 380V 50HZ 3 phase...
Page 39: ......