10
1. Install the power side platform on the cross beams by a fork lift or manual, offset
the cross beams to the outside till the pulleys of both platforms can rest into the
cross beams’ slots
(See Fig.16)
, Install the power side platform and screw up the
bolts.
Fig. 16
Offset the cross beam lean
outward when putting the
powerside platform on the
cross beams
Offset the cross beam lean
outward when putting the
powerside platform on the cross
beams
Illustration for front pulley in
powerside platform