13
H. Illustration for cable installation
1. Pass through the cables from the platform to the columns according to the number
of the cables
(See Fig. 19)
.
NO.
Cable
①
②
③
④
Length for 409-P
(inc. connecting fitting)
124”
363 1/4
”
187”
301 3/8”
Length for 409-HP
(inc. connecting fitting)
132 3/4”
383 1/4”
194 3/4”
321 1/4”
Cable installation diagram
A
C
B
35
36
37
38
Install the cylinder
connecting plate as shown
and pay attention to the
direction of unfilled corner
on the plate.
D
Fig. 19
A
B
C
D