6
2. Move the lift aside with fork lift or hoist, and open the outer packing carefully, take off
the parts from upper and inside the column, take out the parts box, check the parts
according to the shipment parts list
(See Fig. 8).
Fig. 8
3. Loosen the screws of the upper package stand, take off the upper column and
remove the package stand.
4. Move aside the parts and check the parts according to the shipment parts list.
(See Fig. 9, Fig. 10).
Shipment Parts list
Floor cover
Parts box
78
Fig. 10
Parts in the parts box (78)
Fig. 9
Summary of Contents for BP-10
Page 1: ...TWO POST LIFT Model BP 9X BP 10 ...
Page 4: ...2 Arm Swings View 2560mm 100 3 4 Fig 2 ...
Page 11: ...9 G Raise up the carriage and lock it in the same position of safety device see Fig 16 Fig 16 ...
Page 14: ...12 I Assemble oil hose assy See Fig 19 Fig 19 71 73 72 71 69 70 71 71 68 ...
Page 19: ...17 IV EXPLODED VIEW Model BP 9X BP 10 Fig 28 ...
Page 25: ...23 4 3 MANUAL POWER UNIT 071101 Fig 32 Manual Power unit 220V 60Hz ...