- 13 -
2. The cable pass through the cross beam to top plate of columns and be screwed with
cable nuts
(See Fig. 22).
Cable pass through
between the big pulley
and tension pulley
7
Cable pass through top
plate and be screwed
with cable nuts.
Fig. 22
Install limit pin
Cable
48
Pulle
y
47
Limit
pin
After install limit pin