8
Amico Accessories Inc.
Section 2: Installation on Rail Systems
Mounting to Hill-Rom Vertical Rail (with the G-Track Adapter (GTA))
WARNING:
TO PREVENT THE ADAPTER FROM FALLING DOWN THE CHANNEL, ENSURE THAT THE SCREWS ARE
SECURED TO THE TIGHTEST POSSIBLE POSITION. AFTER INSTALLATION, ROTATE THE AHM ARM SIDE TO SIDE AND
VERIFY NO MOVEMENT IS PRESENT BETWEEN THE ADAPTER AND THE RAIL.
WARNING:
REMOVAL OF LOCK NUTS WILL REQUIRE A NEW SET FOR REINSTALLATION. PLEASE CONTACT AMICO
ACCESSORIES INC. FOR SPARE PARTS,
1-877-264-2697
.
1. With the AHM arm locked in the highest vertical position, support the bottom of the arm and guide the head of the
top screw into the opening of the rail
(Figure 1)
. Ensure the flange on the GTA is properly aligned with the rail. Slide
the GTA up so that the head of the bottom screw slides into the opening of the rail.
2. Position the arm to the desired height. Tighten the jam nuts and then the lock nuts on the top and bottom of the
adapter using a 12 mm wrench
(Figure 2)
. Cover the nuts with the plastic caps provided
(Figure 3)
.
Figure 1
Hill-Rom
Rail
Front
Opening of
the rail
Jam nut,
lock nut, and
plastic cap
Figure 3
12 mm nut, lock nut,
and plastic cap
Figure 2
Flange
Backside
Head of
the top GTA pin
Head of the
bottom GTA pin
G-adapter Screw