4010 ATD LT ASSY/OPER/PARTS MANUAL (74303) 12/08
Position and support the wings level with
the main frame (20-21) and secure with the
noted hardware. Support all frames with
work stands.
Mount the shank assemblies (42-43) in the
positions shown. Mount any required stubs
needed to locate all the shank assemblies.
NOTE: it may be necessary to shift the
shanks laterally to allow clearance for the
shank or springs to clear. There are also a
number of shanks which mount to frame
components and do not use the standard
top plate.
Mount the pre-assembled wing lift assemblies
to the front frame tubes as located on the
shank spacing chart (42-43). Mount the front
main lift wheel assemblies to the front tube
of the main frame (16,18). Insert and secure
hub & spindles and tires as shown. Locate
the main frame and wing packer towers and
attach to the rear of the frame, secure with
the mast tubes noted (20,21,24). Assemble
the center packer mount to the center packer
lift bracket and secure with axle clamps and
hardware (24). Slide the inner lift axle pivots
onto the end of the center packer mount, slide
the rear lift mast into position shown. Slide
the center packer hanger onto the ends of the
center packer mount and secure.
Attach the wing packer mounts in the same
manner as noted above (20,21,24). If unit
is equipped with a rear hitch position in the
center of the frame at this point and secure
as noted (28).
Position the main fold anchor assembly
(28) on the top of the rear tube of the main
frame and secure. Position the front wing
rest/lock and secure. Locate the main frame
fold bracket and secure to the wings. Attach
the packer lift anchors (20,21), center in the
adjustment slot, and adjustment bolt to all
rear packer sections. Secure the front lift
masts to the front main frame tube (16,18)
UNIT ASSEMBLY PROCEDURE
Read and review all assembly instructions
before starting assembly of this unit.
This unit will be packed in a condensed
format, usually on a packaging skid. This
package may be very heavy and will require
the use of some type of fork truck or material
handling device to unload the package and
break down the parts. Because the various
frame components are arranged in a vertical
manner any handling equipment must be
able to safely lift and position to a height of
12 ft.
Once bundled skids have been properly
delivered and positioned in a hard, fl at and
level area the various frame parts can be
removed.
NOTE: the components are
banded together in the bundling process
and these bands provide the structure to
maintain the package. Cutting or removing
these bands can cause the components
to tip or fall- make certain that the parts
are properly supported before removing
any bands.
Once the bundle has been broken down into
the individual components locate the main
frame of the unit. Assembly of this unit will
require some type of stands to support the
components during assembly. These stands
should be at least 36 in. tall and of adequate
strength to support the components.
Number noted (XX) indicate page numbers
to reference while assembling.
Position the main frame on the work
stands in the center of the assembly
area. NOTE
: HARDWARE TO SECURE
THE COMPONENTS IS NOTED IN THE
ASSEMBLY INFORMATION. UNLESS
SPECIFIED ALL NUTS ARE TOP LOCK
N U T S . W H E N A S S E M B L I N G T H E
COMPONENTS DO NOT TIGHTEN THE
LOCK NUTS UNTIL ALL PARTS HAVE
BEEN ASSEMBLED. TIGHTEN NUTS TO
HOLD PARTS IN POSITION BUT STILL
6