IntesisBox
®
Modbus Server – Mitsubishi Heavy Industries AC
User’s Manual r1.0 eng
© Intesis Software S.L. - All rights reserved
This information is subject to change without notice
IntesisBox
®
is a registered trademark of Intesis Software SL
URL
Email
tel
http://www.intesis.com
info@intesis.com
+34 938047134
21 / 26
Setup process and troubleshooting
5.
Pre-requisites
5.1
It is necessary to have the Modbus master device operative and well connected to the
Modbus port of IntesisBox
®
. If using EIA232 communication, remember to respect the
maximum of 15 meters cable distance.
Connectors, connection cables, PC for LinkBoxMB, and other auxiliary material, if needed,
are not supplied by Intesis Software for this standard integration. Items supplied by Intesis
Software for this integration are:
IntesisBox
®
Modbus Server device with full Mitsubishi Heavy Industries AC
compatibility without extra components.
Standard plug-in power supply 220Vac 50Hz to power IntesisBox
®
(European plug
type).
Access to LinkBoxMB software download site to configure IntesisBox
®
.
Console cable needed to download the configuration to IntesisBox
®
.
Product documentation.
Setup
procedure
5.2
1.
Install LinkBoxMB on your laptop, use the setup program supplied for this and follow the
instructions given by the Installation wizard.
2.
Install IntesisBox
®
in the desired installation site. For your convenience, check external
enclosure measures (see 7) before deciding where to place the IntesisBox
®
device.
3.
Connect the communication cable coming from the Modbus master device to the
IntesisBox
®
port. Depending on the type of communication protocol:
If EIA232 is used, connect it to C2.
If EIA485 is used, connect it to C1.
If Ethernet is used, connect it to ETH.
(See 3.2 for more information on connection procedure)
Remember that IntesisBox
®
can handle up to two simultaneous Modbus master
connections.
4.
Connect the Superlink network cable to the IntesisBox port marked as AB (see 3.1).
5.
Select the appropriate Superlink mode in the SLK selector. If you are using latest Air
Conditioner of the Mitsubishi Heavy Industries network select NEW, if not select OLD.
Contact your nearest Mitsubishi Heavy Industries supplier in case of doubt.
6.
Connect the IntesisBox
®
device to the power line (see 3.3) and press the On/Off button
to turn it on.
7.
Connect the communication cable coming from the serial port of your laptop/desktop PC
to the IntesisBox
®
port marked as EIA232 Console (see 3.2.3).
8.
Open LinkBoxMB and proceed as explained in section 4.
AMP Air Conditioning
www.ampair.co.uk | sales@ampair.co.uk