AMPEON AMP-Series
http://www.ampeon.cn
3
carding cloth.
2.3 Diverter
Executing structure is composed of A201type rapid diverter and collect box.
A201diverter utilizes three-way air rocking plate type valve structure and has rapid
response speed and small wind pressure loss. The collect box has mesh clapboard to
assure the smooth passing of the air flow and reliable separating of the material that
includes sundries. In the procedure of both positive and negative pressure, this
diverter executive structure can work effectively and it is applicable in the parallel
use of reciprocate bale plucker and disc bale plucker.
3. External dimensions and names of the parts
This equipment is mainly composed of three parts: spark detection control box
(figure2), metal detector (figure3) and diverter (figure4).
Figure 2
:
Diagram of the control box
Type
Remark
A
(mm)
B
(mm)
C
(mm)
D
(mm)
Weight
(
KG
)
300
Applicable to
Φ
300mm pipe
300
560
380
260
19
350
Applicable to
Φ
350mm pipe
350
600
430
260
21
Table 1
:
Dimension table of control box