26
C2X
Amphenol Telect
All rights reserved. 07.10.18 149825 A0
1-509-926-6000
Section Nine: Routing Fiber Cables
Pre-installed cable management fingers route fiber while maintaining proper bend radius.
Fiber should be routed starting with the bottom-most tray or patch plate into and through the bottom-most cable
management finger. Each tray has an available cable management finger to route fiber.
The following installation instructions refer to the C2X 4RU, 3RU and 2RU chassis sizes.
1. With patch plates or trays already installed in the chassis, route fiber into and through the cable
management fingers. Fiber cables can be routed all to the left, all to the right, or split with one side of the
cables exiting out the left and the other side of the cables exiting out the right.
2. Make sure fiber is fully within and routed through the appropriate cable management finger.
Fig. 9-1: Fiber cable routing
All left cable routing
All left cable routing
Split cable routing