8
AM-TC10626LA
Fig.5-d
Fig.6-a
Fig.6-b
3.3.3 Support ring installation
As fig.5-d
,
put L ring terminals
into
φ
5
holes on the right of the column C.
3.3.4 Bead breaker arm assembly installation
Step 1
,
Arm installation, As fig.6-a
,
put arm
M into fixed seat N, tighten with hex bolt O
and flat washer P.
Step 2
,
Arm spring installation, As fig.6-b
,
hang one end of spring S into the hole R, use
spring hook U, hook another end of spring S to
spring pin T, take out spring hook U.
When arm installation, take care, avoid
hands injured!
Summary of Contents for AM-TC10626LA
Page 1: ...PLEASE READ THE PRODUCT MANUAL ENTIRELY BEFORE INSTALLING OR OPERATING THE LIFT ...
Page 22: ...Fig 34 21 AM TC10626LA 9 1 Column assembly 9 Exploded drawings ...
Page 23: ...Fig 35 22 AM TC10626LA 9 2 Turntable assembly ...
Page 24: ...Fig 36 22 AM TC10626LA 9 3 Gearbox motor assembly ...
Page 25: ...24 AM TC10626LA 9 4 Body assembly Fig 37 ...
Page 26: ...25 AM TC10626LA 9 5 Bead Breaker Cylinder Breaker Arm Assembly Fig 38 ...
Page 27: ...26 AM TC10626LA 9 6 Quick inflating system Optional Fig 39 ...
Page 28: ...27 AM TC10626LA 9 7 Simple left help arm Optional Fig 40 INSTALL ...
Page 41: ...40 AM TC10626LA Appendix 1 Electrical Diagram Fig 40 Fig 41 ...