background image

ADJUSTING THE LADDER HEIGHT

1.  With the top and middle sections of the ladder open and the bottom section tucked 

 

2. 

to the front of each side of the bottom section of the ladder. Mark the cut off back 

from these points at the same angle as the treads. 

 

3.  Important: Cut the front corners back 25mm - this can make the ladder easier to 

close and can also prevent damage to the ladder if dropped during opening  

 

 

 

 

FINISHING THE LADDER 

1. 
2.  Measure to the mid-point of the bottom tread and screw the provided screw eye into 

the tread. This is to help unfold the ladder upon opening it. 

underside of the ceiling lining. An architrave will cover the gap between the ladder frame 

Optional: If the ladder is to be installed as the house is being built and before the ceiling 

7.  With the ladder open, pre-drill two 6mm holes in each side of the attic ladder frame 

making sure there is solid timber behind. Screw through the pre-drilled holes into the 

 

8.  Remove temporary cleats. 

9.  Carefully close the ladder and check that the ladder frame is showing around the 

frame and the ceiling frame. Make sure the sides stay plumb and straight. 

10.  Now tighten all screws and check again. 

?

25mm

Summary of Contents for Attic R36

Page 1: ...od head room at the top of the ladder Choose a location with good access at the bottom of the ladder Choose a location that will allow for movement around the ladder when in the down position Allowance must be made for the operation of the ladder as it requires a greater Model Required Opening Landing space Projection R36 1440mm x 650mm 1480mm 2100mm The area for the opening must be clear of wirin...

Page 2: ...ok nut Figure 7 There is now some tension on the spring d The arm with the wire must be on the outside e Tighten the nut and the release half a turn so the arms will move easilly Repeat on the other side These moving joints may require lubricating periodiocally INSTALLING THE LADDER 1 Screw four temporary cleats approx 80mm x 40mm into your timber frame Note If the ladder is to be installed before...

Page 3: ...screw the provided screw eye into the tread This is to help unfold the ladder upon opening it underside of the ceiling lining An architrave will cover the gap between the ladder frame Optional If the ladder is to be installed as the house is being built and before the ceiling 7 With the ladder open pre drill two 6mm holes in each side of the attic ladder frame making sure there is solid timber beh...

Page 4: ...y be void 3 Lubricate all pivot points on your attic ladder at least once a year If your attic ladder is used more than three times a week lubricate every 4 5 months 4 Face the ladder when you are climbing up and down 5 Do not leave young children unattended while ladder is folded down 6 If you have any concerns about your Sellwood attic ladder or it is damaged in any way please call 0800 288 427 ...

Reviews: