Installation
15
6" Color Video Touch Panels
7.
Firmly insert the cable/strain relief combo into the base enclosure opening by pushing the
combo through the base opening (toward the inside) until the relief is securely flush against the
base. Refer to FIG. 14 on page 14 for the final position of the strain relief/cable combo.
8.
Position the base enclosure onto a flat surface.
9.
Grip the CV6 unit, from either sides of the enclosure, and while angling the front of the CV6
unit upwards, connect the AXlink and BNC connectors (FIG. 16) at the their respective
connector locations shown below.
10.
Carefully slide-in the connected CV6 unit (
C
in FIG. 17) into the base enclosure until the CV6
flanges lie flat against the base enclosure.
Take care in positioning the connector wires into
the open space within the base (under the CV6 unit).
FIG. 16
Rear views of the CV6 touch panel
BNC (female) video connector
DB-9 RS-232 connector
CV6 (Rear view)
2-pin PWR
4-pin AXlink
connector
connector
Verify the connectors are securely attached to the AXlink and/or BNC ports on the
rear of the CV6 unit.
FIG. 17
Installation of main CV6 unit into an AC-CV6T enclosure
A
B
- 2 mounting blocks
C
- Main AXD-CV6
- Base
opening
secure the base to the faceplate
touch panel unit
D
- AC-CV6T
faceplate/bezel
CV6 flanges
4 Screws (8-32)
(showing
strain relief
installed
The following steps occur outside the base enclosure.