Before placing frame in fi nal position, attach 
frame attaching bracket to upright rear upper 
splice on each rear upright.

• 

Remove stablizer plate, washer and hex nut from rod 
on bracket.

• 

Insert rod into upright rear upper splice from back of 
pavilion.

• 

Place stabilizer plate, washer and hex nut back onto 
rod so that bracket stays in place.  Do not tighten until 
frame and fabric are completely assembled and in-
stalled.  Do not use stabilizer plate at corner uprights.

Stablizer plate, washer 
and hex nut

Plate for connection to 
existing structure.

U-Shaped stabilizer may not 
be used at corner uprights 
due to fabric interference.

Stablizer plate may not 
be used at corner up-
rights.  Remove.

Figure 3b

Figure 3c

Summary of Contents for Navi-Trac LT/CS

Page 1: ...instructions before the installation or removal of this product Installation Instructions Navi Trac LT CS Pavilion 12 to 24 Projection 7701 Highway 41 N Evansville IN 47725 Phone 812 867 2421 Fax 812...

Page 2: ...er lines near the site 5 When anchoring the structure avoid all underground power lines and gas lines or other utility easements 6 Keep site clear of debris to avoid tripping especially while carrying...

Page 3: ...10 0 PURLIN NAVI TRAC 80410 2 1 2 1 2 1 2 1 2 1 MID TENSIONING TUBE 80779 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 MID TENSIONING TUBE SPLICE 80780 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CONTAINER 1 BASE PLATE ADJUST...

Page 4: ...PROJECTION END UPRIGHT EAVE WELDMENT RIDGE WELDMENT RWP EAVE END R L WELDMENT RIGHT SHOWN EPR EAVE WELDMENT EWP EPL LEFT OPPOSITE SHOWN FRAME ATTACHING BRACKET BASE PLATE ADJUSTABLE 4 HOLE BAP BA BAS...

Page 5: ...PROJECTION E10 EAVE SLIDE IN U 8 UPRIGHT 8 RP 22 RAFTER 22 PROJECTION RAFTER X CABLES EPL END LEFT WELDMENT NOTE UPRIGHTS ARE 8 TO 10 AD JUSTABLE HEIGHT EAVE WELD MENT EWP BAP BASE PLATE ADJUSTABLE 4...

Page 6: ...ructures above 20 projection 2 Hole Base Plate required at this position only LAYOUT DIMENSIONS Pavilion Size A Dimension B Diagonal Dim 12 Projection x 30 12 6 15 16 32 6 3 8 14 Projection x 30 14 6...

Page 7: ...eye bolt with eye nut not usual On rafters with no X cables attach the rafter using the pin attached to the ridge weldment 6 On frames with 20 projection or more rafter brace is now attached to trian...

Page 8: ...a Turnbuckles should be open all the way Figure 3a First beam arch as sembled and raised Note Turnbuckles at free end Eyenuts on inside of Rafter Eyenuts face ground on sec ond rafter Eyenuts on insid...

Page 9: ...lace stabilizer plate washer and hex nut back onto rod so that bracket stays in place Do not tighten until frame and fabric are completely assembled and in stalled Do not use stabilizer plate at corne...

Page 10: ...dment Figure 4d Purlin Drop curved end of purlin into rafter bracket See figures 4e and 4f Drop square hook end into the correspond ing rafter bracket Note If optional installation kit has been used r...

Page 11: ...annel on Upright Rear Upper Splice Feed both kedars down at the same time and at the same time until kedars are fully inserted into channels Fig ure 5b Continue this process until all mids are install...

Page 12: ...Rear Upper Splice Figure 6b After end fabric is in place fiesta buckles on inside of fabric at eave must be con nected Slide kedar pieces with d ring into top outside channel of eave beam Align these...

Page 13: ...n Check mids to be sure they are all pulled to the same point in front and back Check back end straps to be sure they are tightened uniformly When you have checked these things you may now ratchet the...

Page 14: ...ction to existing building must be determined by cus tomer Step 8 Fastening Frame to Existing Building At back of pavilion adjust the frame attaching bracket so that is is fitted up to existing buildi...

Page 15: ...15 Notes...

Page 16: ...vided in the installation instructions is not a suggestion about what is necessary to meet a site specific load For additional important information consult The IFAI Procedural Handbook For the Safe I...

Reviews: