38
Operator's Manual – Log Loader and Forestry Trailer
Anderson Group
4.4 Installing the loader bucket (available for the M-90 and M-115 models)
To install the loader bucket:
1. Remove the grapple by taking the upper shaft out of its pivot (1) and uncoupling the hose
clamps on the four hydraulic hoses.
2. Secure the ends of the bucket knee joints to the two mounting points with screws and nuts
(2).
3. Secure the free end of the bucket cylinder to the mounting point with screws and nuts (3).
4. Remove the two rightmost hydraulic hoses in the jib boom, which controlled the grapple, and
attach them to the bucket cylinder (4).
Figure 16 — Installing the Loader Bucket
Remove the hose support underneath the cylinder
and coil the two unused hoses around the mast, in
front of the cylinder.