ANDREWS COMBIfl o
45
GB
4. Carefully disconnect the fan power connectors from heat engines two and three (if 150 model). This
will result in these heat engines going into lockout, but this can be ignored during commissioning.
Fan power
5. Turn on gas supply.
6. Using the display, select the hot water page and turn on DHW. Ensure the DHW temperature set point
is at 70
O
C (see below)
DHW tank set point
Hot water page
60
O
C
7. Allow three minutes for the heat engine to warm up fully before checking the combustion.
8. Ensuring that the DHW tank temperature remains below 45
O
C during the commissioning process, if
necessary open taps to bring the temperature down. The CO
2
combustion fi gure should be 9.2% +/-
0.1%. Typical expected valves for CO will be between 130ppm and 180ppm (but may be higher during
initial operation).
If you are experiencing CO readings that exceed 250ppm after 30 minutes of burner operation,
please fi rst check that your gas analyser is functioning correctly and then contact Andrews Water
Heaters on the customer support number given on the rear cover of this manual, for advice
.
9. If adjustment is required, remove dust cover of gas valve throttle adjustment screw and insert a 4mm
allen key or medium fl at blade screw driver to adjust.
Adjustment tool
Throttle adjustment screw
MAKE ADJUSTMENTS IN 1/4 TURN STAGES AND WAIT ONE MINUTE BETWEEN EACH
ADJUSTMENT
10. When adjustments are complete, turn off DHW (see point 5) and wait for appliance to stop before
proceeding
Domestic hot water
Operating mode
On
Temporary
.....
Nominal setpoint
70
o
C
Time program
00 12
24
+
CO
2
_
CO
2
Summary of Contents for COMBIflo 100/300
Page 9: ...ANDREWS COMBIflo 7 GB 3 1 GENERAL DIMENSIONS CONNECTIONS 3 0 TECHNICAL DATA ...
Page 12: ...ANDREWS COMBIflo 10 GB 3 4 APPLICATION EXAMPLES Single Heating Circuit Simple ...
Page 13: ...ANDREWS COMBIflo 11 GB Single Heating Circuit Immersion DHW Circulation pump ...
Page 16: ...ANDREWS COMBIflo 14 GB Heating Circuit External 0 10V control ...
Page 17: ...ANDREWS COMBIflo 15 GB BMS INTERNET CONNECTIONS ...
Page 18: ...ANDREWS COMBIflo 16 GB 3 5 WIRING DIAGRAMS PCB 1 ...
Page 19: ...ANDREWS COMBIflo 17 GB PCB 2 3 ...