3.8
Water Connections - General
Fig. 4
3.8.1 Hydrojet System
The heater is fitted with the Hydrojet Total Performance System
incorporated in the cold inlet dip tube. The tube is designed to
increase turbulence and reduce sediment build up, reduce
thermal stacking and increase delivery.
The upper “jet ports”
direct the flow outward
to begin the dynamic
mixing action.
Fig. 5
The lower “jet ports”
direct the flow inward
to increase the
turbulence.
3.8.2 Water Connections - Vented Systems
The water heater must be supplied from a cold water feed
cistern and the hot water supply pipe must be fitted with an open
vent pipe in accordance with BS 5546. Local regulations and
bye-laws must be observed when installing the system but
typical water service layouts are shown in Figs. 5 and 7.
The cold water feed cistern must have an actual capacity
greater than the hourly recovery rate of the heater or heaters to
which it is fitted, the minimum actual capacity allowed for a feed
cistern is 227 litres.
The actual cistern capacity is the capacity to the normal water
line of the cistern. All cisterns used should be to the relevant
British Standard and the distance from the normal water line to
the top of the cistern should be as laid down by the water
authorities.
The cold water inlet and hot water outlet are identified on top of
the heater. Connect the cold water feed and hot water outlet to
these nipples with union adaptors for ease of servicing.
See
See Servicing Section 6.
Caution
Do not apply heat to these nipples if making capillary
soldered joints as they are fitted with plastic inserts. Make
the capillary joints to the pipes before connecting to the
heater. A drain cock is supplied with the heater and this
should be fitted to the appropriate boss as shown on the
drawing.
After installation of the water system open the main water supply
valve, flush the system and fill the heater. Open the hot taps to
allow air to escape from the system. When the system is free of
air, close the taps and check for leaks at the gas control
thermostat, drain cock and pipe connections at the top of the
heater.
Open vent
Stop valve
Overflow
Cold water
Cold water
feed
cistern
Hot water
service pipe
Cold water
inlet valve
Union
adaptor
Flue
Gas cock
Gas control
Gas supply pipe
Thermostat
Check valve
secondary return via
tee in drain port
Drain cock
15
Issue 4 21042018
Summary of Contents for RFF 13/175
Page 8: ...8 Blank Page Issue 4 21042018 ...
Page 19: ...3 11 Wiring Diagram 19 Issue 4 21042018 ...
Page 50: ...8 Parts List 8 1 General Assembly 50 Issue 4 21042018 ...
Page 51: ...51 Issue 4 21042018 ...
Page 52: ...52 Issue 4 21042018 ...
Page 53: ...53 Issue 4 21042018 ...
Page 54: ...8 2 Control Box Assembly 54 Issue 4 21042018 ...