Technical description
Extent of delivery
Boiler transport
Boiler installation
8
Boiler installation
The boiler should be positioned in a
frost-proof boiler room. If the boiler
room is on the roof, the boiler itself may
never be the highest point of the
installation.
When positioning the boiler, please
note the recommended minimum
clearance in the picture. When the
boiler is positioned with less free space,
maintenance activities will be more
difficult.
The (inter)national and local norms for
the installation of heating systems
should be respected at all times.
Standard boiler
A boiler delivery package contains the following components:
Component Pcs.
Package
Boiler fully assembled and tested
1
Mounted on wooden blocks with wooden border,
sealed in PE foil
Adjustable feet
4
Mounted on frame of the boiler
Syphon for condensate connection
1
Cardboard box on top of heatexchanger
(under casing)
Conversion kit for natural gas L and propane incl. instruction
1
Cardboard box on top of heatexchanger
(under casing)
Operation and Installation manual
1
Map attached to back panel of the boiler
Spare parts list
1
Map attached to back panel of the boiler
Wiring diagram
1
Map attached to back panel of the boiler
Integrated additional system controller , incl. all necessary
sensors and sockets (optional)
1
Integrated in electronic switchboard of the boiler.
Sensors and sockets in cardboard box on top of
the heatexchanger (under casing).
Component
R601
R602
R603
R604
R605
R606
R607
Burner/1st heat exchanger assembly
Weight [kg]
Length [mm]
Width [mm]
Height [mm]
86
735
400
321
100
885
400
321
112
1035
400
321
135
735
680
321
158
885
680
321
181
1035
680
321
198
1185
680
321
2nd/3rd heat exchanger assembly
Weight [kg]
Length [mm]
Width [mm]
Height [mm]
90
735
400
244
103
885
400
244
116
1035
400
244
150
735
680
244
170
885
680
244
198
1035
680
244
219
1185
680
244
Condensate receptacle
Weight [kg]
Length [mm]
Width [mm]
Height [mm]
7
589
385
225
9
739
385
225
10
889
385
225
11
589
665
225
12
739
665
225
13
889
665
225
15
1039
665
225
Frame
Weight [kg]
Length [mm]
Width [mm]
Height [mm]
15
990
624
335
16
1140
624
335
17
1350
624
335
17
1100
724
335
18
1320
724
335
19
1470
724
335
21
1620
724
335
Front U-frame with electronic board
Weight [kg]
Length [mm]
Width [mm]
Height [mm]
11
628
1304
202
11
628
1304
202
11
628
1304
202
12
728
1304
202
12
728
1304
202
12
728
1304
202
12
728
1304
202
Boiler transport
Whenever necessary, the boiler can be dismantled into smaller parts for easier transport inside the building. The table below
shows the main dismantled parts with their weight and dimensions.
Summary of Contents for SH60
Page 3: ...3 ...
Page 7: ...Technical description Declaration of conformity 7 ...
Page 26: ...26 UPS32 60F UPS32 120F UPS50 120F UPS65 120F Accessories Plug play kits ...
Page 45: ......
Page 46: ......
Page 47: ......