ANGELUS SANITARY CAN MACHINE COMPANY
SERVICE NOTICE
1 of 3
6/16/95-18033003
Model 180S Main Drive Motor Alignment Procedure
The following is a step by step procedure used to align the Main Drive Motor with the Main Drive
Shaft for Coupling Installation.
This installation process is arranged using Angelus fixture J-13695 or Motor Sub-Base 28S843. Dial
indicator attachment. The Seamer must be level within .001 of an inch/foot with the Can Feed Line
Height set according to Floor Plan dimensions
Angelus Fixture J-13695 attachment.
Parts Required;
Angelus Fixture ....................... J-13695 or
Motor Sub-Base ...................... 28S843
(2) *Sub-Base Support Pads .... 153L816
(2) M16 X 110mm Full thread Hex. Hd.
Capscrews
(2) M16 Full Nuts
(4) M16 X 50mm L. Hex. Hd. Capscrews
(4) M16 Flat Washers
A.
Install Sub-Base Support Pads using
M24 Full Nuts.
B.
Move the Sub-Base into position
under the Brake Housing and install
M16 X 50mm Hex. Hd. capscrews
and Flat Washers.
C.
Install M16 Full Thread Hex. Hd.
Capscrews with Nuts through the
Sub-Base flange.
NOTE:
These jack screws, along with the
*Support Pad screws,are used to make
vertical alignment between the Motor
and Brake Housing.
D.
Level the Motor Sub-Base in position
using *Pad screws and jack screws in
both directions. This is a starting point
for later alignment of shafting.
*Sub-Base Support Pads are used in this alignment and would not
necessarily be used in the field. It is suggested to use jackscrews between
pedestals and the Sub-Base before final grouting.