Operator’s
Manual
Rev
E
4/2/12
pg.
9
Instrument
Installation
Site
Requirements
To install and operate the
ANKOM
XT10
Extraction System you will need the following:
Adjustable wrench
Chilled or tap water supply not to exceed 23°C
Adequate power (see “Operating Environment” section)
Drain
Vent Hood
Instrument
Installation
Procedure
To install the ANKOM
XT10
Extraction System, follow the procedure detailed below.
1.
Remove the instrument from the shipping container and place it on a smooth level surface in an area that
is free of dust and excessive moisture and is within 6 ft. of a drain and cold water supply.
2.
Place the instrument either in a Vent Hood or within 6 ft. of one.
Because the ANKOM
XT10
Extraction System is a closed system, there is very
limited exposure to solvents. When used in conjunction with a charcoal filter on
the vent line the instrument produces less than 1ml of volatiles. It is the user’s
responsibility to determine whether venting of this instrument requires placement
in a hood. Please follow both local and federal regulations when installing this
instrument.
3.
Connect the tube from the top fitting to the water supply.
4.
Connect the tube from the bottom fitting to the drain.
5.
Connect the Solvent Recovery Bottle to the instrument.
Ensure that there are no kinks or bends in any of the tubing connected to the
instrument.
6.
Plug the power cord into a grounded receptacle.
Drain
Water
Supply
Vent
Tube
Solvent
Recovery
Bottle
Summary of Contents for XT10
Page 2: ...This page intentionally left blank ...
Page 4: ...This page intentionally left blank ...
Page 25: ...Operator s Manual Rev E 4 2 12 pg 25 Appendix C Electrical Diagram pg 1 of 3 ...
Page 26: ...Operator s Manual pg 26 Rev E 4 2 12 Appendix C Electrical Diagram pg 2 of 3 ...
Page 27: ...Operator s Manual Rev E 4 2 12 pg 27 Appendix C Electrical Diagram pg 3 of 3 ...