MU120131A/32A PON Quck Start Guide
1
Contents
1.
Introduction ................................................................................................................................ 2
1.1.
Structure of Guide ............................................................................................................ 2
2.
Starting ...................................................................................................................................... 3
2.1.
Installing MD1230B ............................................................................................................ 3
2.2.
Installing Modules .............................................................................................................. 3
2.3.
Power-on/off ....................................................................................................................... 3
2.4.
Starting ............................................................................................................................... 4
3.
Shared Settings ......................................................................................................................... 5
3.1.
Obtaining Ownership ......................................................................................................... 5
3.2.
Setting Ports ....................................................................................................................... 5
4.
End-to-End Measurement ......................................................................................................... 7
4.1.
Connecting DUT ................................................................................................................ 7
4.2.
Creating OLT-side Tx Frames (and Setting OLT->ONU Stream (Down Signal)) .............. 8
4.3.
Creating ONU-side Tx Frames (and Setting ONU->OLT Stream (Up Signal)) ............... 12
4.4.
Checking Flow from Each ONU (Setting OLT
ONU Tx/Rx Counter) ............................ 17
4.5.
Checking
OLT→ONU (Down SIgnal) Flow~Setting Custom Counter ............................. 26
4.6.
Testing Load ..................................................................................................................... 29
5.
Monitoring E-PON Systems .................................................................................................... 32
5.1.
Connecting DUT .............................................................................................................. 32
5.2.
Checking MPCP Control and OAM Function................................................................... 33
5.3.
Application Example 1: Verifying DBA Function .............................................................. 39
5.4.
Application Example 2: Verifying QoS ............................................................................. 42
6.
Summary ................................................................................................................................. 46