Antaira Industrial Ethernet Switches
LMP-0602-24 Series User Manual V1.1
12
4. Hardware Installation
4.1 Installation Steps
This section will explain how to install Antaira’s LMP-0602-24 series: 6-port industrial PoE+
managed Ethernet switch with 4*10/100Tx (30W/Port) RJ45 ports and 2*100Fx (SC/ST) fiber
ports.
Installation Steps
1. Unpack the industrial Ethernet switch from the original packing box.
2. Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.
If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the
DIN-Rail Mounting section for DIN-Rail installation.
If you want to wall mount the industrial Ethernet switch, please refer to the Wall
Mounting section for wall mounting installation.
3. To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the Mounting
Installation section.
4. Power on the industrial Ethernet switch and then the power LED light will turn on.
If you need help on how to wire power, please refer to the Wiring the Power Inputs
section.
Please refer to the LED Indicators section for LED light indication.
5. Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.
6. Insert one side of the RJ-45 cable into switch’s Ethernet port and on the other side into the
networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ-45) LED
on the industrial Ethernet switch will turn on when the cable is connected to the networking
device.
Please refer to the LED Indicators section for LED light indication.
7. When all connections are set and the LED lights all show normal, the installation is complete.