Antaira Technologies - Industrial Ethernet Switches
LNP-2804GN-SFP-T User Manual V1.0
14
between the switch and the link partner (switch, hub, workstation, etc.) must be less than 100 meters
(328 ft.) in length.
2.8 Wiring the Power Inputs
There are two power inputs for normal and redundant power configurations. The power input
2 is used for wiring a redundant power configuration. See the following for terminal block
connector views.
Figure 2.6 Terminal Receptor: Power Input Contacts
To wire the power inputs:
1.
Make sure the power is not connected to the switch or the power converter before proceeding.
2.
Insert a small flat-bladed screwdriver in the V1+/V1- wire-clamp screws, and loosen the
screws.
3.
Insert the negative/positive DC wires into the V+/V- terminals of PW1. If setting up power
redundancy, connect PW2 in the same manner.
4.
Tighten the wire-clamp screws to secure the DC wires in place.
Figure 2.7 Installing DC Wires in a Terminal Block