Anthony Lifgtates, Inc.
30
L-501 Models
www.anthonyliftgates.com
800-482-0003
8.
Final Inspection Checklist
WARNING
Do not use the liftgate if any of the items in the
Final Inspection Checklist are not checked and
verified. If you have any questions, contact
your nearest Anthony distributor, or the Anthony
Liftgates main office.
Check all nuts and bolts to make sure they are
tightened securely.
Make sure all pins are in place and held with proper
retainers.
Make sure the power unit reservoir is fi lled.
With the platform on the ground, the oil level should be
within 1/2 inch of the top of the reservoir.
ALI-00114
1/2"
Install cover on power unit box. Make sure it is
properly secured.
Operate the liftgate through its entire operational cycle
(Up, Down) several times. Make sure the liftgate
operates evenly, freely, and smoothly throughout the
entire operating range and that there is no unusual
noise or vibration while operating the liftgate.
Make sure the latch works correctly.
Make sure the platform is adjusted properly.
Make sure all decals are in place and legible.
Make sure license plate bracket is properly installed,
as required by law.
Make sure lights are installed and operating properly,
per FMVS 108.
Make sure refl ectors are re-installed, if any.
Make sure grab handles and other ingress/egress
items are properly installed as may be necessary.
Make sure the optional cab cut-off switch or power
cut-off solenoid is installed.
Put Installation and Operation manual in the vehicle.
Summary of Contents for ALB-1500
Page 1: ......
Page 2: ......
Page 48: ...Anthony Lifgtates Inc 48 L 501 Models www anthonyliftgates com 800 482 0003 Notes...
Page 49: ...L 501 Models 49 Anthony Lifgtates Inc 800 482 0003 www anthonyliftgates com Notes...
Page 50: ...Anthony Lifgtates Inc 50 L 501 Models www anthonyliftgates com 800 482 0003 Notes...
Page 51: ......
Page 52: ......