MTU-GLR Maintenance
11
Anthony Liftgates, Inc.
800-482-0003
www.anthonyliftgates.com
2. Lengthen or shorten the wheel and channel assembly
on the tube, as desired.
3. Align the two holes in the wheel and channel
assembly with the holes in the tube nearest the
desired position.
4. Re-install the two bolts and nuts. Tighten the nuts to
secure the wheel and channel assembly.
4.4 Platform Adjustment
The ramp (outboard) end of the platform should be 1/2 to
3/4 inches higher than the truck floor when in the raised
position. If the outboard end of the platform is sagging,
add shims as described below. Shimming is a normal
procedure as the liftgate ages, and the parts become
worn.
1/2 to 3/4”
ALI-00590
1. The platform should lower parallel to the ground until
the back portion nearest the truck touches. It should
then tilt forward until the front edge touches the ground.
1
2
ALI-00589
2. To raise the ramp end:
a. Temporarily position a shim plate in the contact
area (arrows), between the cam plates and
platform, with tape.
ALI-00591
Note:
One shim can move the ramp end of the platform
as much as 1/2 inch.
b. Raise and lower the platform to recheck its
position.
c. On steel or galvanized platforms, weld the steel
shim plates to the blocks on the platform. On
aluminum platforms, add the shim between the
stop block and the platform.
3. To lower the ramp end, remove material from the
contact area (arrows shown in Step 2) between the
cam plates and platform.
4. If the platform does not align with the floor extension,
contact Anthony Liftgates for a solution to correct the
problem.
Summary of Contents for MTU-GLR Series
Page 2: ......
Page 23: ...NOTES...