Aode Machinery Co., Ltd Page 13 of 26
奥德机械有限公司
2012
6.2
安装
Installation
6.2.1)
安装空间
Installation Space
A)
安装时,机器周围至少应留有
500mm
的安装空
间,如右图所示。
During installation of the machine, keep at least
500mm installation space around the machine as
shown by the right side picture.
B)
确保安装空间不受阻塞。因为四周拥挤容易造成操作、保养和维修的不便。
Making sure the install space is clean. For the crowded circumstance
is easy to cause inconvenience to operation, maintenance and repair.
ce and repair.
C)
安装时勿坐在机器上面。
Do not sit on the machine while installing.
D)
远离易燃易爆物。
Keep away from flammable and explosive objects.
6.2.2
模具和水管的连接方法
Pipeline connect method with Mold
1)
冷却水循环系统(
Cooling water circulating system
):
a.
将冷却水用耐热水管依照本机的冷却水入口大小接妥。
Connect heat-resistant water pipes according to the size of cooling water inlet.
b.
将本机冷却水回水口接回水源或水塔循环利用避免浪费。
Connect the returning water pipe of cooling water with water source or tower for recycling.
2)
热水循环系统(
Hot water circulating system
):
a.
本机热水出口以铁氟龙管接至模具入口。
Connect hot water outlet with mold inlet using PTFE pipe.
b.
将模具出口接回本机热水入口。
Connect mold outlet with hot water inlet.
3)
补水系统
(
Water Refilling System
)
:
从水源或冷却水塔依照本机的冷却水进出口大小接妥。
Connect from the water source or cooling water tower according to the size of refilling water
inlet.
接冷却入水管
Connected to cooling
water inlet pipe
接热水入水管
Connected to hot water inlet
pipe
接冷却出水管
Connected to cooling
water outlet pipe
接热水出水管
Connected to hot water
outlet pipe
该设备四周
空出
0.5
米以
便维修
Summary of Contents for AWM-05
Page 10: ...Aode Machinery Co Ltd Page 9 of 26 2012 4 2 Pump performance curve...
Page 11: ...Aode Machinery Co Ltd Page 10 of 26 2012...
Page 15: ...Aode Machinery Co Ltd Page 14 of 26 2012 5...
Page 22: ...Aode Machinery Co Ltd Page 21 of 26 2012...
Page 26: ...Aode Machinery Co Ltd Page 25 of 26 2012 Chapter Ten Pipeline System Chart...
Page 28: ...Aode Machinery Co Ltd Page 27 of 26 2012...
Page 29: ...Aode Machinery Co Ltd Page 28 of 26 2012...
Page 30: ...Aode Machinery Co Ltd Page 29 of 26 2012...
Page 31: ...Aode Machinery Co Ltd Page 30 of 26 2012...