Aode Machinery Co., Ltd Page 24 of 26
奥德机械有限公司
2012
第九章
保养与维护
Chapter Nine Maintenance and Repair
9.1
保养周期
Maintenance period
项目
Item
周期
Period
清洗过滤器
Strainer Cleaning
1
个月
One month
清洗电磁阀
Solenoid Valve Cleaning
1
个月
One month
铁氟龙管、接头
(PTFE) pipe, joint
1
年换新
Renew in one year
加热器清洗
Heater Cleaning
3
个月
Three month
电磁接触器
Solenoid valve Contactor
1
年换新
Renew in one year
接线端子螺丝
Terminal Block Screw
3
个月紧固一次
Fasten once every three months
9.2
维修事项
Service and Maintenance
维修时请注意下列事项:
Pay attention to the following rules during maintenance:
机器运行时水温很高
,
维修前先停运机器使其冷却,须待温度降至
30
度以下时方可进行维
修;维修前戴上防护手套。
(请注意,运转过程中切勿检查或拆开机器,否则会引发危险。)
During operation, the water is heated up to a high temperature, Stop the machine before
service and wait it to fall below 30 to perform repairing or maintenance. (Please note that
do not check or disassembly machine during operation; otherwise it will cause danger)
检查机器时至少应有两人在场。冷却机器,关闭电源,排干水。检查维修前确保周围留有
足够空间。
You’d better to have two or more persons on hand when checking the machine. Cool
down the machine, turn off power supply, and drain out the water. Make sure there is
enough space before checking and maintenance.
为延长机器使用寿命,防止事故发生,请定期检查机器状况。
In order to prolong the service life of the machine and prevent accidents, check the
machine regular.
Summary of Contents for AWM-05
Page 10: ...Aode Machinery Co Ltd Page 9 of 26 2012 4 2 Pump performance curve...
Page 11: ...Aode Machinery Co Ltd Page 10 of 26 2012...
Page 15: ...Aode Machinery Co Ltd Page 14 of 26 2012 5...
Page 22: ...Aode Machinery Co Ltd Page 21 of 26 2012...
Page 26: ...Aode Machinery Co Ltd Page 25 of 26 2012 Chapter Ten Pipeline System Chart...
Page 28: ...Aode Machinery Co Ltd Page 27 of 26 2012...
Page 29: ...Aode Machinery Co Ltd Page 28 of 26 2012...
Page 30: ...Aode Machinery Co Ltd Page 29 of 26 2012...
Page 31: ...Aode Machinery Co Ltd Page 30 of 26 2012...