ASP-8/10/12/15KTLC
28
4.5.2 Commissioning
1. Ensure above checking items to comply with the requirements.
2. Turn on the breaker and DC switch at the DC input side.
3. Turn on the breaker at grid side.
4. When all requirements for its normal operation are satisfied, the inverter will
automatically start up and generate power.
5. On-grid PV inverter does not need people to control after its normal operation
starts, and can automatically power off and start up if any fault happens.
4.5.3 Shutdown
1. When solar energy is not enough for power generation, the grid connected
inverter will automatically shut down.
2. Emergency shutdown
If emergency shutdown is needed, you must timely disconnect breaker and DC
switch on AC side, and breaker on DC side. Otherwise, it might cause personal
danger.