ASP-8/10/12/15KTLC
33
6.2 Power generation process
On gird generating capacity process is automatic, described as follows:
1. Switch on DC and AC circuit breakers, the inverter will enter startup mode.
2. If input voltage on DC side exceeds 300V, AC side voltage in range 310V
-
480Vac, and grid frequency is normal, inverter begins countdown.
3. When countdown to 20s, the inverter will start working for grid connecting
power generation.
6.3 Disconnect from grid
When the grid has below abnormal situation, inverter will disconnect from the grid
immediately.
1. Grid voltage is not in the range of 310V
-
480Vac.
2. Grid frequency is not in the range of 45-55 /55-65Hz.
3. PV array voltage is not in the normal range of inverter.
4. Environment temperature is not in the range of inverter working range.
7. Maintenance and Repair
DANGERONS
Do not disassemble the machine yourself. The users who try to repair themselves
may cause electric shock and fire risk.