9
IMPORTANT REMINDERS:
1. Make sure the equipment is placed on a flat stable surface
and all the heat-generating components placed on their re-
spective holders or stands.
2. Ensure all function switches are OFF prior to reworking.
3. Ensure all terminal connections are properly secured.
IMPORTANT
: Please refer to the CONTROL PANEL GUIDE
page for buttons and display panel directory.
OPERATING GUIDELINES
A. INITIAL PROCEDURES
1. Plug the device to the main power source using the power cord
provided in the package.
2. With all function switches deactivated and all terminal connections
properly secured, switch ON the device by activating the main power
switch (“8” from the control panel).
3. The display panels, 11 and 12 will temporarily show the product name
in a scrolling manner and then display “OFF” on all rows once the
scroll is finished (see below illustration). The system will remain at this
state until the user activates a function.
B. HOT AIR GUN
1. Follow the initial procedures above, “A. INITIAL PROCEDURES”.
2. Activate “Hot Air Gun” switch (“14” from the control panel).
3. The system will immediately start to blow air at an airflow rate of 50
while rapidly and safely increasing the air temperature to 100°C
(default system operating parameters). These values will be reflected
from the Hot Air Gun Air Temperature and Air Pressure display
panels, “13” and “12” from the control panel, respectively. The metal
ball inside the air gauge (“1” from the control panel) will also settle
somewhere in the middle of the visible area indicating that the system
is blowing air at an average or normal rate.