9.5 MANAGEMENT OF THE TEST REGARDING THE CORRECT INSERTION OF THE
CORE PROBE
Temperature-controlled cycles are preceded by a 2- phase test for the verification of the correct
insertion of the needle probe.
The second phase is only performed if the first is not completed successfully.
The first phase is completed successfully if the “temperature detected by the needle probe –
chamber temperature” difference is greater than 5°C in at least 3 controls out of 5 (the controls
are performed at 10 seconds intervals, consider the difference without sign).
The second phase is completed successfully if the “temperature detected by the needle probe
– chamber temperature” difference is 1°C higher with respect to the previous control in at
least 6 controls out of 8 (the controls are performed every 8 seconds). If the test is completed
successfully, the cycle will be started; if the test is not completed successfully, the
LED
will flash and the buzzer will be activated for 2 seconds.
To start the temperature-controlled cycle, press the BLAST CHILLING key or the DEEP-
FREEZING key.
After 1 min from the signal that the test has not been completed successfully without having
operated, the cycle is started with time control.
9.6 PRE-COOLING START-UP
Every operating cycle can be preceded by pre-cooling.
Operate as indicated to start pre-cooling:
•
Make sure the device is in the “on” status.
•
Make sure no procedures are in progress
•
Hold the BLAST CHILLING key down for 1 s: the
LED will flash.
Operate as indicated to cut-off pre-cooling:
•
Hold the BLAST CHILLING key for 1 second or start an operating cycle.
When the cabinet temperature reaches 5°C, pre-cooling continues, the
LED remains on
permanently and the buzzer is activated for 1 s.
9.7 SWITCHING THE OZONE SANITIZATION CYCLE
(Only for models with Ozone Sanitization option)
Operate as follows:
•
Make sure the device is in the “on” status and that the door is closed.
•
Make sure that the keyboard is not locked and that no procedure is in progress.
•
Hold the AUXILIARY key down for 1 s: the AUX LED will switch on.
The ozone generator is switched on for 5 minutes; opening the door cause the generator to
switch off
9.8 CORE PROBE HEATING
(Only for models with Heated Core Probe option)
Operate as follows:
•
Make sure the device is in the “on” status or storage is in progress and that the door is open,
•
Make sure that the keyboard is not locked and that no procedure is in progress.
•
Hold the AUXILIARY key down for 1 s: the
LED flashes and the AUX LED will switch on.
Core Probe is heated until the temperature detected by the needle probe reaches 40°C; closing
the door causes heating to be cut-off.
The buzzer is activated for 1 second on conclusion of heating.
Summary of Contents for ASH05K
Page 1: ...Blast chillers User Manual 50LIB055 Rev 002 EN...
Page 30: ...Blast Chillers 30 50LIB055 NOTES...
Page 31: ......
Page 32: ...Abatidores de temperatura Manual del usuario 50LIB061 Rev 002 ES...
Page 61: ...Abatidores de temperatura 30 50LIB061 NOTAS...
Page 62: ......
Page 63: ...Schnellk hler Bedienungsanleitung 50LIB064 Rev 002 DE...
Page 92: ...Schnellk hler 30 50LIB064 ANMERKUNGEN...
Page 93: ......
Page 94: ...Cellules de refroidissement rapide Manuel de l utilisateur 50LIB070 Rev 002 FR...
Page 123: ...Cellules de refroidissement rapide 30 50LIB070 NOTES...
Page 124: ......
Page 125: ...Abbattitore di temperatura Manuale utente 50LIB097 Rev 002 IT...
Page 154: ...Abbattitore di temperatura 30 50LIB097 NOTE...
Page 155: ......
Page 156: ...50LIB067 Rev 002 RU...
Page 157: ...2 50LIB067...
Page 160: ...5 50LIB067 1 2 3...
Page 161: ...6 50LIB067 4 5 98 37 2006 95 2004 108 CE 5 1...
Page 162: ...7 50LIB067 5 2 4...
Page 163: ...8 50LIB067 5 3 6 6 1 7...
Page 164: ...9 50LIB067 8 5 100 C 8 Auxiliary...
Page 167: ...12 50LIB067 8 7 4 2 C 8 8 AUXILIARY AUX 8 9 START STOP 1 Loc 1 START STOP 1 UnL 1 8 10...
Page 174: ...19 50LIB067 10 10 1 10 2 10 3 60 80 2...
Page 175: ...20 50LIB067 11 HACCP HACCP 9 3 HACCP HACCP tiME 1 99 59 AH 1 99 59 PF 1 99 59...
Page 177: ...22 50LIB067 12 1 CH BLAST CHILLING BLAST CHILLING 15 Pb2 60...
Page 178: ...23 50LIB067 13 HARD 5 C 5 C...
Page 179: ...24 50LIB067 AUX Auxiliary HACCP HACCP HACCP HACCP C F min On stand by...
Page 180: ...25 50LIB067 14 HACCP AL AH HACCP Id HP PF HACCP COH CSd...
Page 181: ...26 50LIB067 Pr1 AL A Pr2 Pr1 HACCP Pr3 Pr1 rtc HACCP...
Page 182: ...27 50LIB067 15 5 10 15 HP Display Alarm...
Page 183: ...28 50LIB067 16...
Page 184: ...29 50LIB067 17 R404 R452 17 1 17 1 1 17 1 2 17 1 3 10 17 1 4 200 300 17 2 17 2 1 17 2 2 17 2 3...
Page 185: ...30 50LIB067...
Page 186: ......