EN
77
ADJUSTMENT OF THE TENSION AND REPLACEMENT OF THE BOWL TRANSMISSION
BELTS
The belt tension must be adjusted when it is noticed that the rotation of the bowl tends to slow
down or is not smooth during the execution of a work cycle.
Any type of intervention on the machine must be carried out by suitably
qualified personnel, using suitable equipment and in accordance with the local
safety standards and regulations in force!
Before carrying out any operation on the machine, it is obligatory to:
wear protective clothing suitable for the task to be carried out,
switch off the machine (by turning off the main switch) and disconnect the
machine from the power supply, ensuring that the electrical panel on the machine
and the machine power cable are isolated from the main power supply in a safe
manner for the entire duration of the intervention, without accidental risk of re-
energising of the power supply.
Adjustment of the belt tension:
To tension the bowl transmission belts, turn the nut (pos. A) clockwise using the appropriate
spanner.
To tension the motor transmission belts, turn the nut (part. B) clockwise using the appropriate
spanner.
Replacement of the belts:
To replace the belts, it is first necessary to turn the nut (pos. B) anticlockwise and then the nut (pos. A) in
the same direction (anticlockwise). In this manner, the belts are loosened and can be replaced.
Note: Before replacing the belts, ensure that the new belts have the same characteristics as the original belts
installed on the machine by the manufacturer.
A
B
A
A
B
Bowl transmission belts
Motor transmission belts
Summary of Contents for BAKERY line V Series
Page 2: ...RU V V R 2020 2 400 50 3 5 35 11 05 12 26 24 2 EAC...
Page 4: ...RU 4 1 2 3 4 5 i ii...
Page 5: ...RU 5 1...
Page 6: ...RU 6...
Page 7: ...RU 7 2 CE CE 2 2...
Page 8: ...RU 8 3...
Page 9: ...RU 9 70 A...
Page 10: ...RU 10 4...
Page 11: ...RU 11 5 55 2 1 2 Start Stop Start 1...
Page 12: ...RU 12 6 20 C 40 C 90...
Page 13: ...RU 13 7 A B C C A 2...
Page 14: ...RU 14 8 25x130 3 5...
Page 15: ...RU 15 D A B C B C A D...
Page 16: ...RU 16 9 5 40 C 90 500 500 500...
Page 17: ...RU 17 C B B C 10 D D...
Page 18: ...RU 18 11 B C A D 3 A B D C B...
Page 19: ...RU 19 12 A 2 1 2 3 start A...
Page 20: ...RU 20 A 1 Start A Start BOWL JOG button Start O BOWL JOG button...
Page 21: ...RU 21 13 0...
Page 22: ...RU 22...
Page 24: ...RU 24 3...
Page 25: ...RU 25 14 I 1 2 3 4 5 1 2 3 4 5 Start 1 2 1 2 1 1 1 2 1 2 1 2 1 2...
Page 26: ...RU 26 15 PET ABS PST o o...
Page 27: ...RU 27 1 SITEC 72X144 0 10 0 20 72x144...
Page 28: ...RU 28 Reverse 1 BOWL JOG...
Page 29: ...RU 29 backup backup 2a...
Page 30: ...RU 30 0 10 0 20 C 0 M 0 E 0 1...
Page 31: ...RU 31...
Page 32: ...RU 32 1...
Page 33: ...RU 33 1...
Page 34: ...RU 34 Reverse 1 1 5 JOG BOWL JOG BOWL...
Page 37: ...RU 37 3 H B F A B F...
Page 38: ...RU 38 1 2 3 F 4 B H 5 6 B H 4 A 7 B H F 8 9...
Page 39: ...RU 39 A D E C B...
Page 40: ...RU 40 A B 1 4 2 B 3 4 B C B A A B A 1 D 2 E A 3 4 C B 1 B C D A...
Page 84: ...EN 84 ASSIEME GRUPPO SPIRALE EXPLODED VIEW OF SPIRAL TOOL ASSEMBLY...
Page 87: ...EN 87 ESPLOSO GRUPPO VASCA EXPLODED VIEW OF THE BOWL ASSEMBLY...
Page 90: ...EN 90 ESPLOSO GRUPPO RINVIO VASCA EXPLODED VIEW OF BOWL TRANSMISSION ASSEMBLY...
Page 97: ...97 Equip Group 125080 2 7 495 234 00 33 http equipgroup ru http bakery apach it...