background image

4. Installation

When using AP-DC2453 ionizing air blower

it should be located close to the working

area (100

300mm from the object to be static eliminated). The air outlet of the

ionizer should aim the object. When using the stand of the air blower, it should be
fixed on steady and plain surface such as wall or rack with screw or drawbolt. By
screw the knob on both side of the trestle the horizontal angle can be adjusted so
that the optimal effect of static removing can be achieved.

Operational instruction:

(1)Insert the power cord to the power socket at the back side of the blower.
(2)Switch on the power.
(3)Air volume can be adjusted by screw the air volume knob.

Positioning

Desktop

vertical suspended

Oblique suspended Table clamping

5. Safety

(1)Be aware to read this user manual carefully before install and use this device.
(2)Do not locate this device in the environment with high moisture.
(3)Do not insert any object into air input entry and outlet..

(4)Do not use this device in the flammable and explosive surrounding.

(5)Internal maintenance and repairing must be done by professional engineers.

Reviews: