background image

Revision 1.0 

05/2016 

 

Document No. D112-017

 

 

 

 

 

 

Page 

1

 of 

2

 

IP Point HART 

Quick Start Guide 

A-IP.HART-I 

A-IP.HART-O 

REQUIRED SOFTWARE 

The IP Point HART In/Out requires Aparian Slate software to setup and configure. The software 

installation can be found at 

www.aparian.com/software/slate

 

MODULE INSTALLATION 

The IP Point HART In/Out requires input power of 

12-28Vdc 

(the voltage requirements for the 

field device must also be considered).  

      

 

The wiring of the power connector can be found in the wiring diagram below.  

 

 

 

Reviews: