Revision 1.0
05/2016
Document No. D112-017
Page
1
of
2
IP Point HART
Quick Start Guide
A-IP.HART-I
A-IP.HART-O
REQUIRED SOFTWARE
The IP Point HART In/Out requires Aparian Slate software to setup and configure. The software
installation can be found at
www.aparian.com/software/slate
.
MODULE INSTALLATION
The IP Point HART In/Out requires input power of
12-28Vdc
(the voltage requirements for the
field device must also be considered).
The wiring of the power connector can be found in the wiring diagram below.