Must be complete before scheduling training:
Purchase and have on site for training:
o
Bottle of CO2, gas feed, food grade or better. Minimum requirements are:
o
1-50lbs bottle for 5LD and 5x5LD, 2-50lbs bottles for 20LD, 2-75lbs bottles for 20x20LD
o
Distilled water and Propylene glycol 50/50 mix;
o
Total Gallons needed for system:
o
5LD – 4 gal, 5x5LD – 5 gal, 20LD – 5 gal, 20x20LD – 7 gal
o
Air compressor, air hose, and air blow gun;
1.6 gal. 1 HP Ultra Quiet Air Compressor
o
190 or higher proof ethanol
o
Future maintenance will require:
o
Shop Vacuum with a long, slim nozzle for removing material from extractor.
o
Gates Pencil Type Tension Tester, 30 lbs Deflection Force
o
o
Material to be extracted must be very dry (food dehydrator) and grinded (blender) to the consistence of coffee
grounds. Have ready the day of training as a courtesy to your trainer.
o
After completing the pre-training checklist, request scheduling of onsite training via the link,
http://www.apekssupercritical.com/training/
o
Onsite training is a 4 hour block of instruction that will go into detail the fundamentals of operation and maintenance
of each component of the system.
Tina Henderson
Service Coordinator
740-809-1178
Summary of Contents for 2000 PSI Series
Page 49: ...Updated 6 16 2016 Copyright Apeks LLC 2014 49 ...
Page 50: ...Updated 6 16 2016 Copyright Apeks LLC 2014 50 Appendix C CO2 Phase Diagram ...
Page 51: ...Updated 6 16 2016 Copyright Apeks LLC 2014 51 ...
Page 52: ...Updated 6 16 2016 Copyright Apeks LLC 2014 52 Appendix D Training Process ...