CSP-CSPS-8000/B Section 1 Page 12 of 30
INSTALLATION
SITING THE CSP-S
The CSP-S units can deliver high energy, high voltage pulses, yet still emit minimal
electrical emissions, and so can carry the CE mark.
The CE marking ensure that the CSP-S can be sited next to sensitive electronic
equipment which carry their own CE marking (for susceptibility to emissions) and will be
unlikely to cause them interference. However it is often more convenient to locate the
CSP-S
nearer to the back deck and the deployment area so that the high voltage ‘output’
cable run is minimised.
As high voltages are present, the CSP-S must be located away from water spray and
condensation, in an environment which is not allowed to become too hot. Care should be
taken to allow safe and easy access, and that high voltage cables are out of harms way.
It should also be possible to switch off the unit quickly without having to reach over it!
Ventilation should also be present. All units draw air in from the rear and exhaust air from
the front. For operation the rear cover of the transit case should be removed to allow a
good air flow.
If condensation is allowed to develop serious damage may occur. Good room ventilation
should be ensured, with no sudden change in temperature (ie bringing the unit into a
warm room from a cold area) and allow the fans to operate for 10 - 15 minutes before
switching on the high voltage.
Summary of Contents for CSP-S 4000
Page 2: ...CSP CSPS 8000 B Section 1 Page 2 of 30 ...
Page 3: ...CSP CSPS 8000 B Section 1 Page 3 of 30 OPERATION MANUAL Section 1 ...
Page 4: ...CSP CSPS 8000 B Section 1 Page 4 of 30 ...
Page 6: ...CSP CSPS 8000 B Section 1 Page 6 of 30 ...
Page 8: ...CSP CSPS 8000 B Section 1 Page 8 of 30 ...