Chapter 3. Installing the Base Station IDU
Installing the Base Station IDU
This chapter outlines the basic procedure for installing a PacketMax 5000 wireless
cell system and putting it into operation. It identifies the minimal requirements for
getting the system up and running.
WARNING:
Aperto assumes that installation procedures will be performed by
qualified professionals following all safety and other requirements and
acting in accordance with standard practices and procedures. Failure
to meet safety requirements and/or use of non-standard practices
and procedures could result in personal injury and/or damage to
equipment.
All of the instructions presented in this chapter are discussed in more detail in
subsequent chapters of this manual and in the
PacketMax Subscriber Equipment
Installation and Operation
manuals.
This chapter contains the following topics:
Planning, Site Preparation, and Installation
Synchronizing Multiple BSs at a Site
3
Summary of Contents for PacketMAX 5000
Page 10: ...Preface Preface vi PacketMax 5000 Installation and Operation Manual 10007678 Rev J ...
Page 14: ...Table Of Content TOC 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J ...
Page 146: ...E 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J Chapter E Certifications ...
Page 150: ...F 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J Chapter F Troubleshooting ...