3–3
PacketMax 5000 Installation and Operation Manual, 10007678 Rev J
Chapter 3. Installing the Base Station IDU
Cell sector width may be 60º, 90º, or 120º depending on the antenna chosen.
Distance between base station and subscriber site depends on the frequency
band, line-of-sight, and local conditions. Consult Aperto Networks Customer
Service for more details.
B.
Make sure that the base station site includes a proper mounting structure for the
radios and antennas, an indoor location for the Base Station Unit and a good path
to run coax cable to connect the BSU to the BSR. Aperto Networks’ Customer
Service can provide training and assistance if needed.
C.
Make sure all subscriber sites have an appropriate radio/antenna support or
mounting location.
WARNING:
Each Base Station is required to have lightning protection. Instruc-
tions and specific example of lightning protection equipment is con-
tained in the Surge Protection document. This document is included
in the CD that shipped with the equipment. If it is missing, please con-
tact Customer Service. Failure to follow the instructions will void your
equipment warranty. Your equipment warranty does not cover dam-
age caused by lightning surge, or other environmental stress.
3.2 Installation Procedure
A.
Inspect Package Contents, as displayed in
Figure 3-1
Package Contents
b
a
c
e
a
b
c
d
e
Summary of Contents for PacketMAX 5000
Page 10: ...Preface Preface vi PacketMax 5000 Installation and Operation Manual 10007678 Rev J ...
Page 14: ...Table Of Content TOC 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J ...
Page 146: ...E 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J Chapter E Certifications ...
Page 150: ...F 4 PacketMax 5000 Installation and Operation Manual 10007678 Rev J Chapter F Troubleshooting ...