C
12-15mm
from bath
edge
E
Ф2.75 drill bit
F
Step 1 :
Position the wall profile (1) onto the bath,
approximately 12-15mm from the outside
bath edge to ensure that the screen runs
along the inside edge of the bath rim.(A)
Step 2
: Level the profile with a spirit level, then
mark the position using a pencil,mark
through the 3 pre-drilled screw holes in the
wall profile then drill the marked points using
a 6mm masonry drill bit.Once this is done
insert 3 wall plugs(12).(B)
NOTE
: Y
ou may find it easier to mark and drill the
wall if you apply masking tape to it first.
Step3 : secure the wall profile using 3 x ST4X30
screws (13). (C)
Step 4 : Carefully position the screen into the wall
profile. (D)
Step 5
: Drill the holes in the wall profile through the
vertical profile of the fixed panel using 2.75
drill bit (E), secure profiles together using
the 3 x ST4X12(15) ,cover caps(14) and the
screw cups(16).(F)
D
A
Ф6 drill bit
B
1
1
12
13
16
15
14
4X30mm screws
Screw 4X12mm