G
H
I
J
Fitting The Support Arm & The Bath Channel Bottom Rail
13
12
Step 6 : Position the support arm(6) on the fixed glass panel ,
ensure that the arm is level and horizontal, mark the
position on the wall.(G)
Step 7 : Remove the support arm then drill on the wall through the
marked position using a 6mm masonry drill bit,then insert
the wall plugs(12)(H)
Step 8 : Replace the support arm onto the fixed glass,attach it
onto the wall using 2 x ST4X30 screws.(13)(I). Attach
the glass clamp onto the fixed panel using the 2 x M8X6
grub screws.(J)
Step 9
Step 10
: Place a small amount of silicon sealant onto the bottom of
the bottom rail fixing cap A(9),bottom rail(10),and bottom
rail fixing cap B(11),then secure them into position on the
bath per diagram (K)
:Fit the top cap (2) onto the wall profile. (L)
L
Applying Silicone Sealant
Sealing Inside
Seal from the top of the wall profile to the bottom on the INSIDE
between the wall profile and the wall
IMPORTANT:Do not apply sealant on inside of bath
Sealing Outside
Seal only along the bottom rail and fixed glass on the OUTSIDE
between the profile/glass and the bath. Also up between the wall
profile and the wall.
18
K
24 HRS
DO NOT USE THE
ENCLOSURE FOR
24 HOURS AFTER
SEALING
Apply Sealant Here