TABLE K1 - VOLTAGE REGULATOR
•
Connect the left electric fan connector
and lock it with a clamp, as indicated.
•
Pass the wiring harnesses of the volt-
age regulator and of the pick-up inside
the pre-installed cable gland on the
canister.
•
Fasten the electric fan connector to the
canister support.
TABLE K2 - VOLTAGE REGULATOR
•
Secure the wiring harnesses with a
clamp, as indicated.
RSV4 1100 Factory
Electrical system
ELE SYS - 131
Summary of Contents for RSV4 1100 Factory 2021
Page 1: ...MANUALE STAZIONE DI SERVIZIO 2Q000479 RSV4 1100 Factory ...
Page 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 53: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Page 61: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 105: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 184: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 213: ...INDEX OF TOPICS ENGINE ENG ...
Page 330: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Page 341: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 383: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 428: ...Chassis RSV4 1100 Factory CHAS 428 ...
Page 429: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 452: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Page 464: ...INDEX OF TOPICS BODYWORK BODYW ...