3
!
WARNING:
Check the data plate on this unit before installation. Connect the unit only to the voltage
and frequency listed on the data plate. Connect only to 1 or 3 phase as listed on the data plate.
!
!
!
WARNING:
Disconnect device from electrical power supply and place a Tag Out-Lockout on the
power plug, indicating that you are working on the circuit.
!
!
CAUTION:
Maintenance & repair should be handled by a factory authorized agent. Before doing
any maintenance or repair, contact APW Wyott.
!
!
NOTICE:
Install according to the spacing requirements listed in the installation section of
this manual. We strongly recommend having a competent professional install this
equipment. A licensed electrician should make the electrical connections and connect
power to the unit. Local codes should always be used when connecting these units to
electrical power. In the absence of local codes, use the latest version of the National
Electrical Code.
CONTENTS
Description
Page
Description
Page
Safety Precautions………….……….. 2
Exploded Views ………………………… 7
Specifications..............................….... 4
Parts List……….………………………... 9
General Installation Instructions…… 4
Wiring Schematics …………………….. 11
Cleaning .……………………….…….. 5
Notes……………………………………. 12
Troubleshooting / Service ...……….... 5
Warranty………………………………… 13
Operation…………………...……….... 6
LOCATION OF DATA PLATE
The data plate for the SPTU is located on the back of the unit.
IMMEDIATELY INSPECT FOR SHIPPING DAMAGE
All containers should be examined for damage before and during unloading. The freight carrier has
assumed responsibility for its safe transit and delivery. If equipment is received damaged, either apparent
or concealed, a claim must be made with the delivering carrier.
A) Apparent damage or loss must be noted on the freight bill at the time of delivery. It must then be
signed by the carrier representative (Driver). If this is not done, the carrier may refuse the claim.
The carrier can
supply the necessary forms.
B) Concealed damage or loss if not apparent until after equipment is uncrated, a request for
inspection
must be made to the carrier within 15 days. The carrier should arrange an inspection.
Be certain to hold all contents and packaging material.
Installation and start-up should be performed by a qualified installer who thoroughly read, understands
and
follows these instructions.
Summary of Contents for SPTU- 50
Page 7: ...7 EXPLODED VIEW SPTU ...
Page 8: ...8 EXPLODED VIEW CONTINUED SPTU ...
Page 11: ...11 WIRING SCHEMATIC ...
Page 12: ...12 NOTES ...