background image

8259

Aqua Select

®

 Crossover and Enclosure

Model 

832405B

Hammer and a wood block or rubber mallet

Phillips head screwdriver  

 Drill with 1/8” drill bit

Pliers   

 Liquid soap or lubricant

This crossover is intended for use with the 

Aqua Select

®

 

Everest Bridge Systems. Please start by assembling 

BOTH steps using instructions provided in the STEP BOX, model 832402B. Refer to these directions once you 

have assembled both steps.
If you are installing the 

Aqua Select

®

 

Everest Bridge System, please check the carton labeled “GATE CARTON” 

model 832406 for instructions on gate assembly and attachment, upon completion of installation of crossover. 

TOOLS REQUIRED

FOR USE WITH:

EVEREST

BRIDGE SYSTEM 

(832421B)

(2)

 

832402B — 

Aqua Select

®

 

Everst Steps

(1)

 

832405B — 

Aqua Select

®

 

Crossover and Enclosure

(1)

 

832406   — 

Aqua Select

®

 

Gate

CARTONS REQUIRED

Summary of Contents for 832405B

Page 1: ...structions provided in the STEP BOX model 832402B Refer to these directions once you have assembled both steps If you are installing the Aqua Select Everest Bridge System please check the carton label...

Page 2: ...NECTING STEP 832402WS B CONNECTING RAILS 2 AC CONRAIL C SINGLE PICKETS 2 AC PICKETS1 D DOUBLE PICKETS 2 AC PICKETS2 E TRIPLE PICKETS 2 AC PICKETS3 F LOCK CAPS 5 832402LC 2 G 40 10 x 1 1 4 Screw H 12 1...

Page 3: ...ION QTY 1 AC CONRAIL Connect Rail 1 2 832402WS Connect Step 1 3 832402LC Lock Caps 1 4 AC PICKITS3 Picket 3 2 5 AC PICKITS2 Picket 2 2 6 AC PICKETS1 Picket Single 2 AQUA SELECT CROSSOVER AND ENCLOSURE...

Page 4: ...surface of the connecting step A is facing up towards the rails Push the end of the connecting step into the openings of the connecting rail until fully seated STEP 2 Lay the second connecting rail B...

Page 5: ...ing on the pool top rail It may be necessary to lubricate posts prior to installing crossover CAUTION DO NOT attempt to stand on crossover until bridge is fully assembled 5 STEP 3 Center one of the lo...

Page 6: ...ith liquid soap or lubricant and slip the ends of the handrails into the open ends of the posts on the inside and outside steps Push handrails down until they are fully seated on posts Secure in place...

Page 7: ...The triple picket will line up with the openings in the handrail on the top step The double picket D will fit on the second step down shown The single picket C will be attached to the handrail on the...

Page 8: ...ther than that for which it is intended Maximum weight on steps should NOT exceed 350 lbs WARNING Exceeding the recommended weight limit may cause the step to fail and may result in injury MAINTENANCE...

Page 9: ...of the step mat Make sure the step is centered on the step mat 4 Properly secure step to your pool STEP MATS ARE SOLD SEPARATELY FROM YOUR POOL STEP HOW TO INSTALL YOUR STEP MAT The use of a step mat...

Reviews: